
Call for Price
| Value | RB-MAIN-1020-NSS-23 |
| Display | RB-MAIN-1020-NSS-23 |
| Product Supported | Infoblox NIOS |
| Provided Support | L3+ maintenance with cross-vendor coordination |
| Service Characteristic | Advanced escalation for protocol and integration issues |
| Service Type | L3+ Maintenance and Integration Services |
| Remote Onsite | Remote with vendor coordination; onsite optional |
| Duration Hours | 48 hours (typical engagement) |
| Service Duration | 36 months |
| Service Location | Customer WAN and datacenter environments |
| Service Description | Riverbed impact assessment and L3+ troubleshooting |
| Certification Vendor | Infoblox-certified engineers |
Business account holders on Professional Services typically save 9% vs. retail pricing. Create a free account to see your price.
L3+ denotes advanced, protocol-level troubleshooting and vendor coordination beyond typical support, designed to address issues that originate at network layer interactions such as those introduced by WAN optimization appliances.
Yes. The service includes cross-vendor coordination where Infoblox support will work with Riverbed configuration and diagnostics as needed; any third-party access or approvals are arranged per customer policies.
The offering focuses on assessing Riverbed impacts and validating integrations; it is agnostic to specific models. Detailed constraints or on-site requirements are scoped during the engagement planning phase.
By combining Riverbed-aware integration testing, prioritized L3+ escalation, and joint troubleshooting procedures, the plan narrows root-cause scope quickly and streamlines vendor interaction to accelerate incident resolution.

Infoblox · IB-MAIN-1000-P1-11

Infoblox · IB-MAIN-1050-VIM-11

Infoblox · IB-MAIN-1000-DNS-11

Infoblox · IB-MAIN-1050-DNSK-11

Infoblox · IB-MAIN-1050-VNS-11